800-821-3475
Fax: 815-964-0045
PipeSales@ArntzenCorp.com
Municon Consultants
Vibration Monitoring, Construction Instrumentation, Photo Surveys
Pile Driving Analyzer®
CAPWAP®
info@pile.com
+1 216-831-6131 www.pile.com/pda
Dynamic Load
Testing of:
Driven Piles
Drilled/Bored Piles
ACIP/CFA Micropiles
Helical Piles
For use on site or
remotely with
Foundation capacity
by Case Method or
iCAP® in real time.
CAPWAP® software
for reliable total
capacity, resistance
distribution and
simulated static
load test.
effects of group terminations, especially very large-scale
group terminations which can have a correspondingly large
effect on local economies.
The northern difference
As previously noted, the legislative requirements regarding
group terminations are slightly different for employers operating
in Northern Canada. Notice requirements are more
onerous in the Yukon, Northwest Territories and Nunavut
because their respective employment legislation requires
government notice when 25 or more employees will be terminated
within a four-week period, as compared to the
typical Canadian provincial threshold of 50 employees. This
means that advance government notice requirements will
be triggered more frequently for employers in the northern
provinces and territories.
In Yukon, Northwest Territories and Nunavut, the group
termination provisions require government notice to be provided
in accordance with the following schedule:
1. Four weeks of notice if 25 to 49 employees are to be terminated
within a four-week period.
2. Eight weeks of notice if 50 to 99 employees are to be terminated
within a four-week period.
3. Twelve weeks of notice if 100 to 299 employees are to be
terminated within a four-week period.
4. Sixteen weeks of notice if 300 or more employees are to be
terminated within a four-week period.
It is important for employers who typically operate within
“non-northern” jurisdictions to be aware of this augmented
LEGAL
J. WARREN’S STUDIO/SHUTTERSTOCK.COM
Inukshuk in Gjoa
Haven, Nunavut
The PIPE MILL with FAST SERVICE
Producing:
24”-192” OD
.312”-2.00” Wall
Lengths up to 120 ft.
Straight Seam - DSAW
20 ft. Lengths in Stock
Shipping Nationwide and Canada
TM RAMMING QUALITY
Vibration Monitoring: Ground, Water & Air.
Inclinometer, Piezometer & Tiltmeter Systems.
Remote Reading for Economical Long Term Monitoring
2200 Jerrold Ave, Suite K, San Francisco CA 94124
Phone: 415-641-2570 Fax: 415-282-4097
PILING CANADA 61
/pda
/SHUTTERSTOCK.COM
link
link
/pda
/SHUTTERSTOCK.COM
link
link