LEGAL
120 days of its last provision of work/
labour or materials.
In March 2009, Langford hired
Valard Construction to perform drill-ing
work on the construction project.
Valard began work on March 17, 2009
and finished on May 20, 2009. During
Valard’s work, neither the bond, nor
notice of it, was posted on the con-struction
site. Further, during the
As a result of
this decision,
an obligee
under a labour
and material
payment bond
should take
all reasonable
steps to inform
subcontractors
and suppliers of
the bond.
ensuing 120-day notice period, neither
Bird nor anyone on its behalf notified
Valard of the bond’s existence. Valard
was, therefore, unaware of the bond
throughout the entire window of time
Centrum CPG Pile Splices
for Precast Concrete Piles
Centrum CPG Pile Splices
for Precast Concrete Piles
Advantages
Advantages
• CE approval
• Large size selection and possibility to customize
• Quick and safe installation proces on construction site
Threaded rebars means:
• Safe and strong connection to pile
• Cost effective shipping on pallets
and/or containers
Automated production line ensures:
• Cost effective production
• Uniform high quality
• Full traceability
For more information, please contact Jacob Thorhauge on jacob@centrumpaele.dk
• CE approval
• Large size selection and possibility to customize
• Quick and safe installation proces on construction site
Threaded rebars means:
• Safe and strong connection to pile
• Cost effective shipping on pallets
and/or containers
Automated production line ensures:
• Cost effective production
• Uniform high quality
• Full traceability
For more information, please contact Jacob Thorhauge on jacob@centrumpaele.dk
MICHELLOISELLE / 123RF STOCK PHOTO
64 Q3 2018 www.pilingcanada.ca
/profile_michelloiselle
/www.pilingcanada.ca
link
/profile_michelloiselle
/www.pilingcanada.ca
link