Golden Ears Pump Station
Langley pump station to support
massive treatment plant expansion
By Kelly Gray
A new pump station near Golden Ears Way and
113B Avenue in Maple Ridge, B.C., will replace
an existing facility and help move wastewater
from Maple Ridge and Pitt Meadows to
the treatment plant in the Township of Langley. The
new pump station will replace the existing Katzie Pump
Station and support the upcoming Northwest Langley
Wastewater Treatment Plant expansion. The new storage
tank, next to the pump station, will temporarily store
PROJECT SPOTLIGHT
wastewater to prevent overflows during storms. The
project includes architectural design elements such as
large feature windows on the pump station facade and
vertical precast concrete fins suspended from the concrete
walls around the pump station. Excavation began in
spring 2020, with above-ground work underway this past
spring. The project will finish in winter 2022.
Henry Foundation Drilling, Inc. (HFDI) designed
a cost-effective shoring solution that would also act
PHOTOS: HENRY FOUNDATION DRILLING, INC.
PILING CANADA 23