Q3 2015 www.pilingcanada.ca Your Backed by the largest independent
ground engineering specialist in
the world, Keller Canada prides itself
in being able to provide full service
geotechnical construction solutions
for any job, no matter what the challenge.
Keller Canada was established in July
2013 after the UK based Keller Group
Plc, acquired North American Caisson
Ltd, a division of North American
Construction Group (NACG). The
global Keller Group is the world’s largest
and most advanced independent
ground engineering specialist and operates
in over 40 countries and employs
over 9,000 people. The Keller Group
has provided Keller Canada access to
new technologies and techniques, specialty
equipment, personnel, resources,
relationships and opportunities that
continue to assist in driving the value
they offer their employees and clients.
With over 30 years of experience
working in Canadian soils, Keller
Canada, (Including Keller Foundations,
Keller Pile Driving, Cyntech, and Geo
Foundations), provides safe, high
quality, innovative and competitive
geotechnical construction solutions
for all foundation piling, earth retention/
excavation support and ground
improvement needs for all industries.
Keller has the experience, capacity,
capability and flexibility to comfortably
take on multiple large scopes simultaneously
across major capital projects.
Keller offers the best of being big
and the best of being small. The
best of being global and the best of
being local.
Reliable, capable
and competent. The
possibilities are endless
Keller Canada’s work on the Suncor Fort
Hills project, since first being awarded a
comprehensive load test program late
2013, has been growing steadily and are
now involved in four separate project
scopes across:
• Utilities and off-sites (U&O)
• Ore-preparation (OPP)
• Extraction and tailings (E&T) and;
• Secondary extraction.
Built on Keller Canada’s strong
reputation and depth and breadth of
services, clients have come to rely on
Keller to get the job done safely and
competitively to the highest standards
of operational excellence.
Keller Canada is able to offer innovative
solutions to overcome our client’s
greatest geo-technical challenges in a
very specialized field.
Early Engagement –
Load Testing – Site Wide
Keller Canada was engaged early on
the Suncor Fort Hills project (the
largest capital project currently being
undertaken in Alberta), due to our past
experience, reputation, capabilities
and competitiveness.
Keller Canada was awarded a contract
for the supply, installation and
load testing of 15 driven steel pipe piles.
Full-scale top down static load tests,
lateral load tests and tension tests were
conducted on 20 inch, 24 inch, 30 inch,
and 36-inch diameter steel pipes to
loads as high as 12.0 MN (1,350 tons).
All testing was conducted in general
accordance with ASTM D1143, D3966,
and tension specifications.
Keller Foundations Ltd. –
Extraction & Tailings (E&T)
& Ore Preparation Plant
(OPP) – Bird Construction
Keller was hired as a replacement contractor
to assist in the completion of
6 one-stopshop
geo-technical
construction partner
/www.pilingcanada.ca