INSPECT WITH
Real-Time Excavation Inspection
Remove the uncertainty of drilled shaft excavation
with SoniCaliper excavation inspection. Using
sonar technology, it provides a full 360-degree,
three-dimensional measurement of shaft excavations
for a profile of shape, alignment and verticality. With
detailed results — designers, contractors and owners
know that shafts have been constructed according to
specification and meet quality standards.
FUGRO LOADTEST
800 368 1138
info@loadtest.com
www.loadtest.com
GREAT CANADIAN PROJECTS
install the anchors, which were completed on schedule by
the end of June 2016.
Pre-project planning and communication between project
management and site personnel was essential to the success
of the project due to the remoteness of the site and schedule
requirements. Changing soil conditions also presented chal-lenges
for trying to maintain production when casing and/or
hollow stem augers were required on over 50 per cent of the
anchor boreholes.
In the end, DSD completed the tangent pile wall and DCP
ground anchors on schedule and budget. The project is being
highly monitored by means of shape array accelerometers
(SAA), strain gauges and load cells. After one year of moni-toring,
the wall is performing extremely well.