		GREAT CANADIAN PROJECTS 
 Temporary Secant   
 Shoring Wall 
 Special precautions for specific ground conditions 
 Doublestar Drilling was awarded the large-scale condo  
 development project, West Village, in April 2017 by  
 Cidex Group, which is located on the west entrance  
 of Calgary’s downtown core. Due to the successful  
 collaboration between Doublestar Drilling (DSD) and Cidex  
 Group earlier in 2017 on The Hat project in the East Village,  
 both parties were eager to be working together once more.  
 DSD equipped their crews with three large piling rigs, two  
 Liebherr LB-28 rigs and one Liebherr LB-24 rig, to ensure the  
 client’s schedule was met. To further prepare themselves,  
 DSD took special precautions such as segmental casing to  
 confirm the best drilling practices were being used for this  
 job’s specific ground conditions. A total of six hundred and  
 thirty-eight 880-mm diameter piles were installed during the  
 four months of piling.  
 Due to the high-density work area, coordination of traffic  
 to ensure safe access and strategic organization of all move-ment  
 to reduce congestion and minimize any traffic flow  
 impacts was a main priority. DSD minimized noise levels  
 to reduce any impact to the surrounding residential towers  
 with special sound dampeners on the Kelly Bars, as well as  
 engine silencer kits on the Liebherr drilling rigs. Idling time  
 was restricted only to meet production requirements. Their  
 well maintained Liebherr drilling rigs have the latest engine  
 technology, thus further reducing emissions.  
 Anchor drilling began in early July and the company has  
 currently completed a third of the installations. Their crew  
 is using the Davey Kent 725 rig and the Interoc AN150 rig  
 to install 36-mm Dywidag bar up to 54 feet in length. All of  
 the tie-back anchors will be stressed at 125 per cent of their  
 Submitted by Doublestar Drilling 
 PHOTOS COURTESY OF DOUBLESTAR DRILLING 
 PILING CANADA 69