ONTARIO
3320 Miles Road, RR#3
Mount Hope, Ontario
L0R 1WO
Local: (905) 679-6999
Toll Free: (877) 468-7473
Fax: (905) 679-6544
QUEBEC
805 1 ère Avenue
Ville Ste. Catherine, Quebec
J5C 1C5
Local: (450) 638-3320
Toll Free: (888) 514-0040
Fax: (450) 638-3340
Interpipe Inc. is a steel pipe distributor of new
and used structural steel pipe. We have two
large stocking locations of Seamless, ERW,
Spiralweld and DSAW pipe.
Interpipe Inc. is a steel pipe distributor of new
and surplus structural steel pipe. We have
several large stocking locations of Seamless,
ERW, Spiralweld and DSAW pipe.
3” OD – 48” OD in a variety of wall thicknesses
are stocked in both locations.
2" OD – 48" OD in a variety of wall thicknesses
are stocked in all locations.
Piling Pipe 80,000 min yield seamless pipe for
Micro Piling.
Seamless and ERW pipe for Driven Piles, Screw
Piles and Drill Piles.
Large Diameter pipe for Driven Pile or Caissons.
www.interpipe.com
Seamless and ERW pipe for Driven Piles,
Screw Piles and Drill Piles.
Large Diameter pipe for Driven Pile or Caissons.
ONTARIO
3320 Miles Road, RR#3
Mount Hope, Ontario
L0R 1WO
Local: (905) 679-6999
Toll Free: (877) 468-74
Fax: (905) 679-6544
QUEBEC
805 1 ère Avenue
Ville Ste. Catherine, Quebec
J5C 1C5
Local: (450) 638-3320
Toll Free: (888) 514-0040
Fax: (450) 638-3340
Interpipe Inc. is a steel pipe distributor of new
and used structural steel pipe. We have two
large stocking locations of Seamless, ERW,
Spiralweld and DSAW pipe.
3” OD – 48” OD in a variety of wall thicknesses
are stocked in both locations.
Piling Pipe 80,000 min yield seamless pipe for
Micro Piling.
Seamless and ERW pipe for Driven Piles,
Screw Piles and Drill Piles.
Large Diameter pipe for Driven Pile or Caissons.
ONTARIO
3320 Miles Road, RR#3
Mount Hope, Ontario
L0R 1WO
Local: (905) 679-6999
Toll Free: (877) 468-7473
Fax: (905) 679-6544
QUEBEC
805 1 ère Avenue
Ville Ste. Catherine, Quebec
J5C 1C5
Local: (450) 638-3320
Toll Free: (888) 514-0040
Fax: (450) 638-3340
used structural steel pipe. We have sever al
large stocking locations of Seamless, ERW,
Spiralweld and DSAW pipe.
2" OD – 48" OD in a variety of wall thicknesses
are stocked in all three locations.
Piling Pipe 80,000 min yield seamless pipe for
Micro Piling.
Seamless and ERW pipe for Driven Piles,
Screw Piles and Drill Piles.
Large Diameter pipe for Driven Piles or Caissons.
drilling, cutter-soil mixing and grout-ing
to reduce mobilization costs to this
remote site.
“We can solve the most complex
challenges that are thrown to us in
terms of logistics, ground conditions
and engineering,” said Hebib.
“The project required the construc-tion
of a water retention dike in a lake
to dry up a lake section for open pit
mining of the A21 kimberlite pipe – a
diamond-bearing rock formation. Over
a period of two years, BFCA worked on
this project in a remote, subarctic envi-ronment
with only seasonal ice road
access. The team used equipment for
vibro densification, curtain grouting
and rigs from the BG series for cased
large diameter drilling, and the innova-tive
cutter-soil-mixing and jet grouting
to build the 1.7-kilometre long plastic
concrete cut-off-wall with depths of
up to 25 metres. The project was com-pleted
on time to pump out the water
from the separated lake section for
open pit mining.”
Closer to head office, BFCA worked
on the ICE District Towers A and E
in Edmonton. The team constructed
150-steel reinforced piles with lengths
of up to 75 metres for the JW Marriott
Hotel (Tower A) and the Stantec tower
(Tower E). With 66 floors, Tower E will
be Western Canada’s tallest tower.
BFCA performed test piles close to 50
megapascal test load.
The team used BG40 and BG50 rigs
for the job – the latter was the largest
drill rig within the BAUER worldwide
fleet. Although temperatures dropped
to -30°C, BFCA worked 24 hours per
day, six days a week until the project
was completed on time and on budget.
“We had the capability to install
piles to over 100-metre depths had it
been required by the test pile results,”
said Hebib.
BFCA recently played a major role in
the construction of the new Champlain
Bridge that crosses the Saint Lawrence
River and Saint Lawrence Seaway
– a project that has been described
as one of the biggest worksites in
North America.
BFCA constructed 200 concrete
piles, with diameters of 1,300 and
2,000 millimetres and lengths ranging
from 10 to 24 metres, that have been
COMPANY PROFILE
“The quality of our equipment is
well recognized in the industry
as many of our competitors
use the BAUER equipment.”
– Samir Hebib
PILING CANADA 27