COMPANY PROFILE
HEFEI ZIKING STEEL PIPE CO., LTD.
THE BEST SUPPLIER OF STEEL PIPE from CHINA
• Mono pile for marine terminals: up to 80 m (262 ft) in
length – custom-made by order
• Well known in Canada & USA for more than 10 years
• We can do coating or galvanize,
attach pile shoes, spin-fins,
interlock or end plugs
Company Certificates
Big Events in 2018
• NASPD, Houston, Feb. 15–17
• IFCEE, Orlando, March 5–10,
Booth #119
• OTC, Houston, May 1–3,
Booth #6424
Associate Memberships
Contact: shenwei@hfzijin.com ¡ www.hfzijin.com
Tel.: 1-604 -638-2716 ¡ Cell :1-604 -816-3898 ¡ USA: 1-425-236-5043
Office: 11th Fl., 1200 W. 73th Ave., Vancouver, BC V6P 6G5, Canada
Mill: No. 31 Beijing Rd., Baohe Industrial Area, Hefei Anhui, China
Hefei was involved in the expansion of the Nanaimo Port
Cruise Ship Facility in the Port of Nanaimo. Cruise ships had
been accessing the harbour since 2002, but there was no permanent
facility to discharge passengers, who had to take a
shuttle boat to reach the shore. A new floating concrete pier
was built that was moored to a number of pilings. Hefei provided
piles for the project. The company has also provided
material to Alberta’s energy industry for various projects.
In the U.S., Hefei has played a part in the reconstruction of
the coastal infrastructure of New Orleans following Hurricane
Katrina in 2005. Hurricane Katrina saw high winds, high
water and erosive waves pound the coastline, which caused
significant damage to piers, beach houses, roads and numerous
residences; many were destroyed outright. With many
marine terminals needing steel pipe, Hefei’s services have
been in demand.
Wang says the company understands the process.
“Contractors of pile driving really love to get finished
mono pile on site without further processing, splicing or
coating,” he said. “If this is achieved, they save big when it
comes to cost, time and complexity of handling.”
Recently, Hefei’s 80-metre long mono pile will supply a
Canadian federal strategic energy project. As Wang says, this
was a monumental moment for the company.
“Our current year-long supply project at the federal level
shows that we’re receiving more recognition from stakeholders
of major projects,” said Wang. “We are positioned to be
the first priority for upcoming projects similar to this one
For Canada – Our extra long super mono piles on river
barge to sea port and upload directly to Ocean Ship
when it comes to supplying steel pipe piles. This will help us
make further progress when it comes to being a prominent
supplier in North America.”
PILING CANADA 79
link