ONTARIO
3320 Miles Road, RR#3
Mount Hope, Ontario
L0R 1WO
Local: (905) 679-6999
Toll Free: (877) 468-7473
Fax: (905) 679-6544
QUEBEC
805 1 ère Avenue
Ville Ste. Catherine, Quebec
J5C 1C5
Local: (450) 638-3320
Toll Free: (888) 514-0040
Fax: (450) 638-3340
Interpipe Inc. is a steel pipe distributor of new
and used structural steel pipe. We have two
large stocking locations of Seamless, ERW,
Spiralweld and DSAW pipe.
Interpipe Inc. is a steel pipe distributor of new
and surplus structural steel pipe. We have
several large stocking locations of Seamless,
ERW, Spiralweld and DSAW pipe.
3” OD – 48” OD in a variety of wall thicknesses
are stocked in both locations.
2" OD – 48" OD in a variety of wall thicknesses
are stocked in all locations.
Piling Pipe 80,000 min yield seamless pipe for
Micro Piling.
Seamless and ERW pipe for Driven Piles, Screw
Piles and Drill Piles.
Large Diameter pipe for Driven Pile or Caissons.
www.interpipe.com
Seamless and ERW pipe for Driven Piles,
Screw Piles and Drill Piles.
Large Diameter pipe for Driven Pile or Caissons.
ONTARIO
3320 Miles Road, RR#3
Mount Hope, Ontario
L0R 1WO
Local: (905) 679-6999
Toll Free: (877) 468-74
Fax: (905) 679-6544
QUEBEC
805 1 ère Avenue
Ville Ste. Catherine, Quebec
J5C 1C5
Local: (450) 638-3320
Toll Free: (888) 514-0040
Fax: (450) 638-3340
Interpipe Inc. is a steel pipe distributor of new
and used structural steel pipe. We have two
large stocking locations of Seamless, ERW,
Spiralweld and DSAW pipe.
OD – 48” OD in a variety of wall thicknesses
are stocked in both locations.
Piling Pipe 80,000 min yield seamless pipe for
Micro Piling.
Seamless and ERW pipe for Driven Piles,
Screw Piles and Drill Piles.
Large Diameter pipe for Driven Pile or Caissons.
ONTARIO
3320 Miles Road, RR#3
Mount Hope, Ontario
L0R 1WO
Local: (905) 679-6999
Toll Free: (877) 468-7473
Fax: (905) 679-6544
QUEBEC
805 1 ère Avenue
Ville Ste. Catherine, Quebec
J5C 1C5
Local: (450) 638-3320
Toll Free: (888) 514-0040
Fax: (450) 638-3340
used structural steel pipe. We have sever al
large stocking locations of Seamless, ERW,
Spiralweld and DSAW pipe.
2" OD – 48" OD in a variety of wall thicknesses
are stocked in all three locations.
Piling Pipe 80,000 min yield seamless pipe for
Micro Piling.
Seamless and ERW pipe for Driven Piles,
Screw Piles and Drill Piles.
Large Diameter pipe for Driven Piles or Caissons.
As the operator moves the joysticks,
the text reads the inclination change
required to get to design inclination,
and another reading gives the inclination
heading change required to
achieve the design inclination heading.
Meanwhile, he sees the green pile
moving toward the yellow line on the
screen.
“The third screen is where you select
which design pile you are going after.
Once the pile is selected, the screen
shows the design pile properties such
as northing, easting, elevation, length
and inclination,” said Keys.
The system uses the Trimble BX982
Marine GNSS Receiver, which Keys
calls the “brain” of the system.
The antennas were two Trimble
Rugged Zephyr 2 GNSS antennas, one
providing position and the other to
allow calculation of heading.
The Alva crew built a metal bracket
perpendicular to the pile driver lead,
with a rail around it to protect the
antennas and the pitch and roll sensor
from the free-swinging piles as they
were loaded into the leads. The bracket
was placed high on the lead to minimize
the possibility of it being struck
by the piles.
Another concern was for the cable
that connected the components to
the computers in the cab. The solution
was to run the cable inside the crane
boom, with sufficient slack to prevent
movement of the crane and leads from
affecting it.
The cab-based equipment included
a laptop computer to run the TMC software
and the Trimble GNSS receivers.
Because space in the cab was limited,
TECHNOLOGY UPDATE
Trevor Yocum with the mock-up of the
system in the Measutronics parking
lot. The engineers all pitched in and
created the system in 10 days.
The Alva crew
designed this bracket
to hold the GPS
antennas and the
pitch/roll sensor to
protect the sensors
from the piles as
they were loaded
into the leads
CONTINUED ON PAGE 14
12 Q2 2017 www.pilingcanada.ca
/www.interpipe.com
/www.pilingcanada.ca
/www.interpipe.com
/www.pilingcanada.ca